Situation at the construction site

Luxurious, special, specific to our city – different from others. Monitor the situation on the construction site and
be informed about all current events of the RIO KANTRIDA project.

11.07.2022.
20.05.2022.
06.04.2022.
18.02.2022.
17.01.2022.
20.12.2021.
11.11.2021.
19.10.2021.
21.09.2021.
30.08.2021.
09.08.2021.
15.07.2021.
23.06.2021.
31.05.2021.
10.05.2021.
14.04.2021.
15.03.2021.
02.03.2021.
15.02.2021.
01.02.2021.
08.01.2021.
10.12.2020.
26.11.2020.
17.11.2020.
2.11.2020.
19.10.2020.
02.10.2020.
Initial state